Primary Texas Data Center![]() The Planet’s electrical infrastructure is broken into three primary zones within the datacenter (A, B, C). Zone A services ˝ of the datacenter with electricity. Zone B services the remaining ˝ of the datacenter and Zone C overlays the entire datacenter creating a complete redundancy in electricity. Our South generator is a 1 Megawatt – 12 cylinder diesel generator sitting atop a 2000 gallon diesel tank. This generator supplies electricity for zone C and has a maximum runtime of 15 days with onsite fuel. Offsite fuel contracts have SLA requirements of 4 hours for a refuel. Utilizing both generators and complete power redundancy. Diesel generators can run indefinitely and are monitored by our DATATRAX™ monitoring system. |